bob半岛·(中国)官方登录入口-Global Platform

Maintenance of robot drag chain equipment content and required time

发布时间:2019-10-16 00:00:00 浏览次数:39

The robot drag chain sleeve can provide traction and protection for built-in cables, oil pipes, air pipes, water pipes, etc. Each section of the drag chain can be opened for easy installation and maintenance. Low noise during exercise, wear-resistant, and able to move at high speeds. The main body of the chain plate is composed of high-quality steel plate chrome plated support plate (extruded aluminum alloy), shaft pins, alloy steel, and other components, so that there is no relative movement or deformation between the cable or rubber tube and the drag chain. The chain plate has a novel appearance effect after chrome plating, a reasonable structure, high flexibility and strength, the steel plate is not deformed, easy to install, reliable to use, and easy to disassemble. Especially, this product uses high-strength wear-resistant materials, alloy copper as the pin, The wear resistance of the drag chain has been improved, with more flexible bending, less negative force, and reduced noise, thereby ensuring long-term use without deformation and sagging.



Maintenance of robot drag chains


General maintenance of robot drag chain equipment content and required time:


Before work:

1. Check the handover record book

2. Strictly follow the equipment" Lubrication Chart" Provide refueling according to regulations, ensuring timely, quantitative, and qualitative refueling.

3. For equipment that has been shut down for more than 8 hours, when the equipment is not started, it is necessary to turn it low for 3-5 minutes to confirm whether the lubrication system is unblocked and whether all parts operate normally before starting to work.


At work:

1. Regularly check the operation of various parts of the equipment and the working condition of the lubrication system. If there are any abnormalities, immediately notify the maintenance personnel to handle them.

2. It is strictly prohibited to place tools, workpieces, metal objects, and foot pedals on each guide rail surface and protective cover.



After work:

1. Wipe off the iron filings and coolant on the guide rail surface, and ensure that there is no black oil on the screw and polished rod.

2. Clean the iron filings and debris around the equipment.

3.arefully fill in the equipment handover record.



Level 1 maintenance robot drag chain content and required time: once a month, with a duration of eight hours.



(1) Appearance of the cleaning equipment: 1. The appearance should be free from yellow robes, oil stains, and natural colors, and the appearance components should be complete and undamaged. 2. The guide rail, gear rack, smooth screw, and lead screw are free of black oil and rust, and are ground to remove burrs.


(2) Clean and unblock the lubrication and cooling system, pipelines, including oil holes, oil cups, oil lines, and oil felt filtering devices. 1. The oil window is clear and bright, the oil label is eye-catching, the oil is filled in place, and the oil quality meets the requirements. 2. The oil tank, oil pool, and filtration device are clean inside and outside, without scale or impurities. 3. The oil line is complete, the oil felt is not aging, the lubricating oil circuit is smooth, and there is no oil or water leakage. 4. The oil gun and oil pot are clean and easy to use, with complete oil nozzles and cups, and the hand pump and oil pump are easy to use. 5. Remove all protective covers, check lubrication, and wipe the guide rail, smooth screw, and lead screw.


(3) Check and adjust the iron filings, pressure plates, and gaps of each part, and ensure that the fixing screws, nuts, and handles of each part are flexible and easy to use. 1. Adjust the clearance between each diagonal iron, pressure plate, and sliding surface to within 0.04mm, allowing the moving parts to move freely. 2. There are no loose or missing fixing screws and nuts in all parts.


(4) Check all safety devices 1. All limit switches, indicator lights, signals, and safety protection devices are complete and reliable. 2. All electrical devices have good insulation, reliable grounding, and safe lighting.



(5) Check that all electrical components meet the requirements. 1. The inside and outside of the electrical box are clean, free of dust and debris, and the box door is not damaged. 2. The electrical components are securely fastened and functional, with neat wiring and clear and complete wire numbers. 3. The motor is clean and free of oil stains, dust, and the fan and cover are complete and easy to use. 4. The snake skin tube is free from detachment, breakage, and oil stains, and the waterproof elbows are complete.


(6) Clean the surroundings of the workplace. 1. There should be no iron filings or debris around the equipment. 2. Reasonable placement of machine tool accessories, tools, and fixtures, cleaning and positioning



Purpose and characteristics of robot drag chains



(1) Suitable for use in reciprocating motion situations, it can provide traction and protection for built-in cables, oil pipes, air pipes, water pipes, etc.



(2) Each section of the drag chain can be opened for easy installation and maintenance. Low noise during exercise, wear-resistant, and able to move at high speeds.



(3) Drag chains have been widely used in CNC machine tools, electronic equipment, stone machinery, glass machinery, door and window machinery, injection molding machines, robotic arms, overweight transportation equipment, automated warehouses, etc.